There's still a lot of work to be done to get the water system in order, but the drilling job is done and the team makes ready for departure. They leave in the same way they arrived - in a small compact pickup loaded to the hilt. Every piece of equipment used over the duration of the operation of nine days is on that vehicle!
No comments:
Post a Comment