Tuesday, November 27, 2007

Well digging, pipes

60 meters of pipes being lowered into the well with the pump. The black cable is the power cable for the pump and the white cord is for lowering it all down. It'll remain in place for the purpose of bringing the pump back up in the future for maintenance.

No comments: