Sunday, November 25, 2007

Well digging, first tube

The first tube to be lowered into the well will be this one. It will be riddled with slits, thus allowing water to enter without infiltration of debris. The submersible pump will also be placed in this first tube, about 2 meters from the bottom of the well.

No comments: